The US National Aeronautics and Space Administration (Nasa) has announced that the test phase for the Artemis I space mission had been completed. This decision followed the analysis of the data collected during the launch ‘wet dress rehearsal’ conducted at the Kennedy Space Centre in the US State of Florida on June 20. The Space Launch System heavy rocket and the Orion spacecraft that it will lift into space would now be ‘rolled back’ to the Vehicle Assembly Building during this week, where the rocket and space capsule would be prepared for actual launch. Artemis I will be an uncrewed test flight. Following the Nasa’s decision that the testing phase was over, Artemis I was now scheduled for launch in late August, although the specific target date has not yet been set.