Designer SMEC South Africa and construction contractor Stefanutti Stocks Coastal have progressed in its work to replace the old swing bridge at the V&A Waterfront that connects the Pierhead and the Clock Tower precincts.
The massive structure that is 42 m long and 4 m wide will need to be craned into position.