The National Energy Regulator of South Africa (Nersa) announced on Thursday that the Energy Regulator, at its meeting held on February 25, approved the issuance of a generation licence for a 40 MW solar photovoltaic (PV) plant to be developed at the South Deep gold mine, in Gauteng. The licence was granted to GFI Joint Venture Holdings Proprietary Limited and Gold Fields Operations Limited (South Deep Joint Venture) to operate a generation facility to be constructed in Westonaria, south-west of Johannesburg.