The Department of Mineral Resources and Energy (DMRE) has clarified that it is aiming to release bid documentation for the so-called fifth bid window (BW5) of the South Africa’s renewable-energy procurement programme in December, following receipt of the regulator’s concurrence with a Ministerial determination that clears the way for the resumption of procurement. The Section 34 Ministerial determination has not yet been formally published in the Government Gazette, but the DMRE indicated to Engineering News & Mining Weekly on Monday that it intended Gazetting the document “before the end of next week”, having received the National Energy Regulator of South Africa’s concurrence on September 2.