Mobile and modular power solutions provider Aggreko has signed a ten-year contract with global miner Gold Fields to provide a 25.9 MW hybrid solar and thermal power solution for the Salares Norte openpit gold/silver mine, in Chile. This solution has been designed to provide power for the entire mine, which sits at an altitude of 4 500 m in the Andes mountain range and is 190 km from the nearest town.